YURIZAL, M. An Analysis of Factors Affecting Labor Productivity of Upper Structure Work on the Hurun Beach Resort Project Using the AHP (Analytic Hierarchy Process). Journal of Engineering and Scientific Research, [S. l.], v. 5, n. 1, p. 27–32, 2023. DOI: 10.23960/jesr.v5i1.129. Disponível em: https://jesr.eng.unila.ac.id/index.php/ojs/article/view/129. Acesso em: 27 jul. 2025.